Basket: 18 Documents

Type Number Issue Title Published Revision Due Status Price Remove from Order
Engineering Recommendations (EREC)G12Issue 5Requirements for the Application of Protective Multiple Earthing to Low Voltage Networks 2023NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)G99 FormsIssue 1EREC G99 Application Forms Apr 2026NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)TELE 4Issue 2Code of practice for the installation of ADSS optical cable Mar 2025NoCurrent £45.00 Remove from Order
Technical Specifications (TS)48-6-5Issue 3Functional Test Requirements – Voltage Protection Oct 2025NoCurrent £45.00 Remove from Order
Engineering Reports (EREP)131Issue 3Analysis package for assessing the security contribution from distributed generation and electricity storage systems – Users’ guide Jun 2020Q2 2025Current £0.00 Remove from Order
Engineering Recommendations (EREC)EB/TPIssue 4Telecommunication Providers and Distribution Network Operators joint use of poles Jan 2025Q1 2030Current £0.00 Remove from Order
Technical Specifications (TS)09-23Issue 3LV link boxes Mar 2026Q1 2031Current £45.00 Remove from Order
Engineering Recommendations (EREC)111Issue 1Information Exchange between DistributionCHAR(13) + CHAR(10) Network Operators Dec 2025NoCurrent £0.00 Remove from Order
Engineering Technical Reports (ETR)122Issue 1Guide to the application of Engineering Recommendation G5/4 in the assessment of harmonic voltage distortion and connection of non-linear equipment to the electricity supply system in the U.K Dec 2002NoCurrent (Under Revision) £185.00 Remove from Order
Engineering Recommendations (EREC)G43Issue 5Instructions for Reporting to the National Fault and Interruption Reporting Scheme Mar 2025NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)P18Issue 2Complexity of Distribution Circuits Operated at or above 22kV 2022NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)G83Issue 2Issue 2 Amendment 3 CHAR(13) + CHAR(10) Recommendations for the Connection of Type Tested Small-scale Embedded Generators (Up to 16A per Phase) in Parallel with Low-Voltage Distribution Systems Jun 2019Q2 2024Current £0.00 Remove from Order
Engineering Recommendations (EREC)L44Issue 2Separation between Wind Turbines and Overhead Lines: Principles of Good Practice Mar 2025NoCurrent £45.00 Remove from Order
Safety Health and Environment Standards (SHE Standard)06Issue 3Post Trip Manual Reclosing of High Voltage Electrical Distribution Circuits Jan 2025Q1 2030Current £0.00 Remove from Order
Engineering Recommendations (EREC)P29Issue 1Planning limits for voltage unbalance in the UK for 132 kV and below1990NoCurrent (Under Revision) £0.00 Remove from Order
Technical Specifications (TS)41-21Issue 2Portable earthing equipment for overhead lines and substations Jan 2022Q1 2025Current (Under Revision) £65.00 Remove from Order
Engineering Recommendations (EREC)G99 SAFIssue 1Standard Application Form - Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Jun 2025NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)G81 Part 6Issue 2Framework for new industrial and commercial underground connections - Part 6 Installation and records 2016Q1 2023Current £0.00 Remove from Order

Order Total:

 £430.00