Basket: 9 Documents

Type Number Issue Title Published Revision Due Status Price Remove from Order
Engineering Recommendations (EREC)C55Issue 5Insulated sheath power cable systems 2014NoSuperseded £105.00 Remove from Order
Engineering Recommendations (EREC)P24Issue 1AC traction supplies to British Rail 1984NoSuperseded £0.00 Remove from Order
Engineering Recommendations (EREC)G101Issue 2Voltage Measurements for Assessment of Compliance with Statutory Voltage Limits Mar 2025NoCurrent £0.00 Remove from Order
Engineering Recommendations (EREC)G55Issue 3Safe tree working in proximity to overhead electric lines. Nov 2013NoSuperseded £55.00 Remove from Order
Engineering Recommendations (EREC)G99 SAFIssue 1Standard Application Form - Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Jun 2025NoCurrent £0.00 Remove from Order
Technical Specifications (TS)48-6-5Issue 2Functional Test Requirements – Voltage Protection Jan 2020Q1 2025Superseded £45.00 Remove from Order
Technical Specifications (TS)43-40Issue 2Specification for single circuit overhead lines on wood poles for use at high voltage up to and including 33 kV Feb 2004NoSuperseded £125.00 Remove from Order
Engineering Recommendations (EREC)G84Issue 2Recommendations for the connection of mobile generating sets to public distribution networks Mar 2013NoSuperseded £105.00 Remove from Order
Engineering Recommendations (EREC)G81 Part 5Issue 2Framework for new industrial and commercial underground connections - Part 5 Materials specification 2016Q1 2023Current £0.00 Remove from Order

Order Total:

 £435.00