| Technical Specifications (TS) | 48-6-3 | Issue 3 (Revision) | Functional Test Requirements – Transformer Differential Protection 
 | Oct 2025 |   | Current |  £45.00 |  Add to Order | 
| Technical Specifications (TS) | 48-6-5 | Issue 3 (Revision) | Functional Test Requirements – Voltage Protection 
 | Oct 2025 |   | Current |  £45.00 |  Add to Order | 
| Technical Specifications (TS) | PO5 A2 | Issue 5 (Revision) | Protection of telecommunication lines from power lines 
 | Sep 2025 |   | Current |  £55.00 |  Add to Order | 
| Engineering Technical Reports (ETR) | 132 | Issue 3 (Revision) | Engineering Technical Report 132 Issue 3 2025 Improving resilience of overhead networks under storm conditions. 
 | Aug 2025 | Q3 2030 | Current |  £30.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G137 | Issue 2 (Revision) | Application Guide for Wildlife Protection Schemes for HV Overhead Lines 
 | Aug 2025 |   | Current |  £Free |  Add to Order | 
| Safety Health and Environment Standards (SHE Standard) | 05 | Issue 3 (Revision) | Reporting of incidents to the Health and Safety Executive (HSE) in accordance with regulation 31 of the Electricity Safety, Quality and Continuity Regulations 2002 (ESQCR) 
 | Jul 2025 |   | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 48-6-4 | Issue 2 (Revision) | Functional Test Requirements – Busbar Protection Relays 
 | Jun 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G94 | Issue 1 (New) | Managing the Risks Associated with the Provision of Multiple Connections in Close Proximity 
 | Jun 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G99 SAF | Issue 1 (New) | Standard Application Form - Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 
 | Jun 2025 |   | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 43-127 | Issue 1 (New) | Wildlife Protection Product Specification for HV Overhead Lines 
 | May 2025 |   | Current |  £Free |  Add to Order | 
| Safety Health and Environment Standards (SHE Standard) | 01 | Issue 3 (Revision) | Safe Working on the Low Voltage Electrical Distribution System 
 | Apr 2025 | Q2 2030 | Current |  £Free |  Add to Order | 
| Engineering Technical Reports (ETR) | 147 | Issue 1 (New) | Power Quality Information Required for Heat Pumps and their Assessment 
 | Apr 2025 | Q1 2030 | Current |  £Free |  Add to Order | 
| Safety Health and Environment Position Papers (SHE Position Paper) | 12 | Issue 1 (New) | Working in or Near Water (including Flood Water) 
 | Mar 2025 | Q1 2030 | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G101 | Issue 2 (Revision) | Voltage Measurements for Assessment of Compliance with Statutory Voltage Limits 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G43 | Issue 5 (Revision) | Instructions for Reporting to the National Fault and Interruption Reporting Scheme 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G76 | Issue 3 (Revision) | Guide to the practical aspects of quality management associated with assessment of power system plant & products 
 | Mar 2025 |   | Current |  £90.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G79 2D | Issue 4 (Revision) | Guide to the assessment of power system products for use by the ENA Member Companies 
Part 2D: Procedure for the conformity assessment of protection products 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G98 | Issue 2 (Revision) | Requirements for the connection of Fully Type Tested Micro-generators (up to and including 16 A per phase) in parallel with public Low Voltage Distribution Networks on or after 27 April 2019 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G98 Forms | Issue 1 (New) | EREC G98 Application Forms 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Reports (EREP) | G98/99 | Issue 2 (Revision) | Distributed Generation Connection Guide: G98 & G99 
 | Mar 2025 | Q1 2026 | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G99 | Issue 2 (Revision) | Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G99 Forms | Issue 1 (New) | EREC G99 Application Forms 
 | Mar 2025 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | L44 | Issue 2 (Revision) | Separation between Wind Turbines and Overhead Lines: Principles of Good Practice 
 | Mar 2025 |   | Current |  £45.00 |  Add to Order | 
| Engineering Recommendations (EREC) | TELE 3 | Issue 2 (Revision) | Code of practice for overhead to underground optical cable connections 
 | Mar 2025 |   | Current |  £55.00 |  Add to Order | 
| Engineering Recommendations (EREC) | TELE 4 | Issue 2 (Revision) | Code of practice for the installation of ADSS optical cable 
 | Mar 2025 |   | Current |  £45.00 |  Add to Order | 
| Safety Health and Environment Standards (SHE Standard) | 06 | Issue 2 (Revision) | Post Trip Manual Reclosing of High Voltage Electrical Distribution Circuits 
 | Jan 2025 | Q1 2030 | Current |  £Free |  Not Available | 
| Safety Health and Environment Standards (SHE Standard) | 06 | Issue 3 (Revision) | Post Trip Manual Reclosing of High Voltage Electrical Distribution Circuits 
 | Jan 2025 | Q1 2030 | Current |  £Free |  Add to Order | 
| Safety Health and Environment Standards (SHE Standard) | 09 | Issue 3 (Revision) | Distribution Network Operator Response to Reports of Low or Grounded Overhead Lines 
 | Jan 2025 | Q4 2030 | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 48-6-10 | Issue 1 (New) | Testing approach for merging units for protection sampling of instrument transformers in accordance with BS EN IEC 61869-13 
 | Jan 2025 | Q1 2030 | Current |  £45.00 |  Add to Order | 
| Engineering Recommendations (EREC) | EB/TP | Issue 4 (Revision) | Telecommunication Providers and Distribution Network Operators joint use of poles 
 | Jan 2025 | Q1 2030 | Current |  £Free |  Add to Order | 
| Engineering Technical Reports (ETR) | 001 | Issue 1 (New) | Generation Sharing Guidance 
 | Oct 2024 | Q2 2025 | Current |  £Free |  Add to Order | 
| Open Networks Processes (ON Proc) | 001 | Issue 1 (New) | Standard Pre-Qualification Procurement Process for Flexibility Services 
 | Jul 2024 | Q4 2026 | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 09-06 | Issue 10 (Revision) | Auxiliary multicore and multipair cables 
 | Jul 2024 | Q1 2029 | Current |  £105.00 |  Add to Order | 
| Technical Specifications (TS) | 43-14 | Issue 4 (Revision) | Insulated Aerial Bundled Conductors For Low Voltage Overhead Distribution Systems – Conductor Fittings and Associated Apparatus 
 | Jul 2024 | Q1 2034 | Current |  £80.00 |  Add to Order | 
| Technical Specifications (TS) | 43-15 | Issue 4 (Revision) | Insulator Binds and Equivalent Helical Fittings for Overhead Lines 
 | Jul 2024 | Q2 2029 | Current |  £80.00 |  Add to Order | 
| Technical Specifications (TS) | 35-3 | Issue 3 (Revision) | Continuous Maximum Rated (CMR) system transformers (for use on systems up to 132 kV) 
 | May 2024 | Q1 2029 | Current |  £105.00 |  Add to Order | 
| Technical Specifications (TS) | 35-7 | Issue 3 (Revision) | Tap-changers for system voltages up to and including 132kV 
 | May 2024 | Q4 2029 | Current |  £80.00 |  Add to Order | 
| Safety Health and Environment Position Papers (SHE Position Paper) | 04 | Issue 3 (Revision) | Occupational Health and Wellbeing Framework 
 | Jan 2024 | Q1 2029 | Current |  £Free |  Add to Order | 
| Safety Health and Environment Position Papers (SHE Position Paper) | 10 | Issue 2 (Revision) | Occupational Fatigue Management within ENA Electricity Networks Member Companies 
 | Jan 2024 | Q1 2029 | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 09-11 | Issue 3 (Revision) | Low voltage heat-shrinkable material components for use up to and including 600/1 000 V 
 | 2024 |   | Current |  £80.00 |  Add to Order | 
| Engineering Reports (EREP) | 144 | Issue 1 (New) | DNO Common Network Asset Indices Methodology V2.1: Health & Criticality 
 | 2024 | Q4 2028 | Current |  £Free |  Add to Order | 
| Engineering Reports (EREP) | 145 | Issue 1 (New) | Good Practice Guide to DNO Common Network Asset Indices Methodology V2.1 
  
 | 2024 | Q4 2028 | Current |  £Free |  Add to Order | 
| Engineering Reports (EREP) | 146 | Issue 1 (New) | DNO CNAIM V2.0: Methodology Changes Explained 
 | 2024 | Q4 2028 | Current |  £Free |  Add to Order | 
| Technical Specifications (TS) | 35-2 | Issue 7 (Revision) | Emergency rated system transformers 66/20.5 kV, 66/11.5 kV and 33/11.5 kV delta/star and star/star connected 
 | 2024 |   | Current |  £105.00 |  Add to Order | 
| Technical Specifications (TS) | 41-18 | Issue 3 (Revision) | Partial discharge testing of bushings, capacitors, instrument transformers and switchgear of rated voltage 7.2 - 420 kV inclusive 
 | 2024 | Q1 2030 | Current |  £45.00 |  Add to Order | 
| Technical Specifications (TS) | 43-103 | Issue 4 (Revision) | Low voltage overhead line shrouding materials 
 | 2024 |   | Current |  £80.00 |  Add to Order | 
| Technical Specifications (TS) | 43-13 | Issue 4 (Revision) | Aerial Bundled Conductors Insulated with Cross-Linked Polyethylene for Low Voltage Overhead Distribution 
 | 2024 |   | Current |  £20.00 |  Add to Order | 
| Technical Specifications (TS) | 43-7 | Issue 5 (Revision) |   132 kV steel tower transmission lines: Specification L4(m) 
 | 2024 | Q1 2030 | Current |  £285.00 |  Add to Order | 
| Technical Specifications (TS) | 43-96 | Issue 3 (Revision) | Fasteners and Washers for Wood Pole Overhead Lines 
 | 2024 | Q1 2030 | Current |  £45.00 |  Add to Order | 
| Technical Specifications (TS) | 48-2 | Issue 3 (Revision) | Fault Passage Indicators up to 132kV for Underground and Overhead Distribution Systems 
 | 2024 |   | Current |  £65.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G38 | Issue 2 (Revision) | Operational procedure associated with electricity supplies for traction purposes on AC and DC electrified lines 
 | 2024 |   | Current |  £65.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G44 | Issue 4 (Revision) | Code of practice for the coordination of power line carrier system frequencies in the range 30•0 kHz to 526•5 kHz 
 | 2024 |   | Current |  £55.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G59 A8 | Issue 3 (Revision) | Issue 3 - Amendment 8 
Recommendations for the Connection of Generating Plant to the Distribution Systems of Licensed Distribution Network Operators 
 | 2024 |   | Current |  £Free |  Add to Order | 
| Engineering Recommendations (EREC) | G80 | Issue 4 (Revision) | Recommendations for the safe working of utilities’ staff and other parties near light rapid transit systems 
 | 2024 |   | Current |  £55.00 |  Add to Order | 
| Engineering Recommendations (EREC) | G99 A10 | Issue 1 (New) | Issue 1 – Amendment 10 
Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019 
 | 2024 |   | Current |  £Free |  Add to Order |